Country: Turkey

>>  Click here to open Rail Infrastructure Observation Project Map for Turkey <<.

Legend:
Green: Line in service
Red: Line under construction
Pink: Construction abandoned
Yellow outline: Tunnel section
Black: Existing network (as provided by Google, available only in "Relief" mode at close zoom)

Primary objective is to document railway infrastruchture built on new alignment. Upgrades of existing alignments are generally not shown, except some cases of total transformation.

Progress report (with links to map)

2021.11.05 (v.2.9)

Added:

* Several major and minor new sections U/C

2020.10.25 (v.2.8)

Added:

* Several major and minor new sections U/C

2019.04,29 (v.2.7)

Added:

* Ankara-Sivas HSL (467km):  The initially envisaged city terminal in Sivas has been dropped in favour of a new through station in the southern suburbs. Approx. 2km of already build alignment has been removed, including a 500m long river viaduct. Initial provisions for a continuation towards Erzican in the east are being carried out.
* The last missing tunnels of Istanbul - Ankara HSL of the Sakarya cut-off are eventually under construction.
* After a rather slow start, works on (Ankara)-Yenice-Izmir HSL seem to finally take up velocity. The line is under construction on approx. 2/3 of its length, including passing a demanding mountain ridge with tunnels and ramps whose works started recently.
* Only little progress can be observed along the 106km Osmaneli - Bursa HSL,  whose works were launched in 2012. While a 40km stretch including approx. 15km of tunnels north and east of Bursa is now entirely under construction, the remaining gap seems not to have started yet.

* Several major and minor new sections U/C

2018.08.31 (v.2.6)

Added:

* Several major and minor new sections U/C

2017.09.17 (v.2.5)

Added:

* Several major and minor new sections U/C

2016.11.18 (v.2.4)

Added:
* Bahaci - Nurdagi 16 km shortcut railway in Southeast Turkey. Includes 10.1km single track Geçişi Tunnel. Works started around 2013.
* 8,5 km railwy Akçagöze Başpınar improvement. Includes two tunnels with 3780m and 1720m. Works started around 2015
* New worksites have appeared along approx. 30 km on Polatli - Afyonkaharisar high speed railway line.
* 25 km Izmir east railway approach. Built around 2008, might be continued further into city?
* Further shorther segments on HSL lines: High bridges east of Kirikkale on Ankara - Shivas HSL.

 

2015.12.05 (v.2.3)

Added:
* Kayseri bypass: "Lonely" section (21km) of a future high speed line in central Anatolia [Jump to lonely HSL near Kayseri].

Corrected:
* Collapsed tunnel bypass: To mitigate several years (since +/-2009) of failure to complete a 7,2km tunnel along the Ankara - Istanbul corridor near Bilecik [Jump to collapsed tunnel craters], starting from 2012 a single track bypass line has been built. It includes a 2,3km long tunnel which entered service around 2014 enabling the usage of the otherwise isolated high speed line segment of around 65km [Jump to bypass line].

* Temporary switch-over from high speed line to classic line at the current nothern end of the HSL mentioned right above near Aifuatpasa [Jump to current end of HSL line].

 

2015.11.08 (v.2.2)

Added new U/C line:
* Bandırma-Bursa-Ayazma-Osmaneli: First tunnels north of Bursa [Jump to line].


2014.11.08 (v.2.1)

Added:
* High Speed lines:
- Line U/C Section Geyve - Orencik (7km, on Ankara - Istanbul line) mostly in tunnels [Jump to section].
- Line U/C Section Gomü - Bayat - Afyonkarahisar (43km, on Polatu - Izmir line) [Jump to section].


* Medium speed lines:
- Marmaray Tunnel (2013, 13.6km)  [Jump tp Marmaray tunnel].
- Link with Georgia from Kars to Qulalisi (97km) [Jump tp Gerogia link].


2014.08.20 (v.2.0) 

NEW line IN SERVICE: New High Speed services between Istanbul and Ankara. This line includes:

1.) 64km of totally rebuilt old line between (East-)Ankara and Izmid along the Gulf of Izmid coast through highly densely populated regions. Tight curves, low speed.
2.) Sanca - Köseköy (23km) upgarding and partial new alignment along Sapanca lake [Jump tp section].
3.) 138km of new high speed (250km/h) line through mountains between Geyve  and Eskişehir including 22 tunnels totaling 43km [Jump tp section].
4.) City tunnel in Eskişehir [Jump to city tunnel].

* Further U/C sections on Ankara - Sivas [Jump to line]. 

2014.05.27 (v.1.0)

Initial release

 

 